A project where we installed busbar flanges to the roof of an Eaton 9395P 900kVA UPS system.
This was to tie in with the overhead busbar system. The flanges were connected to the UPS internal connections using solid copper busbar. The flanges were factory fitted offsite. Each of the UPS sections were then delivered, offloaded, positioned and interconnected onsite.